My WES18 Hoisting
WES18 hoisting is a job for experts and needs to be well prepared.

Your local WES dealer will select a local hoisting expert and they will make a hoisting plan for your WES18 wind turbine. If needed a member of the WES project team will be on site to assist during hoisting or hoisting preparation.
Many different questions need to be answered when a hoisting plan is made, the most important ones are:
- On what kind of soil will the crane operate?
- Are access road and working platform sufficient or is additional excavation needed?
- What crane is the best fit for the job?
- In which weather conditions is hoisting possible?
- How to offload the turbine from the truck or container?
- How to move the different components around on site?
- How to assemble sub components?
- How to assemble the complete turbine?
- How many people are needed on site and what kind of equipment is needed?
- How do the people communicate during hoisting?
- What safety regulations apply on site?
| A WES18 with a lattice tower can be erected without a crane. Ropes, pulleys, winches, some temporary constructions and manpower allow you to construct the lattice tower without the need for a crane. Once the lattice tower has been erected the nacelle and rotor can also be lifted and connected without the use of a crane.Installing a WES18 on a lattice tower without a crane is also a job that needs to be prepared by your local WES dealer and the local construction team. If needed the WES project team can be involved. |
A WES18 wind turbine with a tubular tower is often erected using only one 70 ton crane (or bigger). |
|
|