Standard ways of transport bring your WES18 to any place on the world.
Arranging transport and delivery for a WES18 is a job for specialists. Most parts of the turbine are strong and robust while others, like the blades and control cabinet, are delicate and need extra attention when prepared for transport. Your WES dealer and the WES shipment team select the best way of transport for your wind turbine.
WES18 turbines fit in standard containers or in standard trucks. Containers are shipped from Rotterdam all over the world, ideal for deliveries outside of Europe. For European projects standard trailers will deliver your WES18 directly from the WES factory in the Netherlands to your site.
Sometimes standard 40 foot containers or big trucks cannot make it all the way to the site. In those situations the WES18 components are offloaded close to the site and delivered on site by special transport. When multiple turbines are shipped to the same location combinations are made, 4 turbines (without towers) fit for example in one container or one one truck.
WES towers are being produced all over the world by certified tower manufacturers and are often directly shipped to site. The foundation anchors are shipped ahead of the rest of the turbine and are integrated in the foundation.
A: Cell Energy 78 York Street, London, W1H 1DP, England